N1-E41 CONNECTOR over MORRO CREEK

05-SLO-001-30.00-MOBY · County 079, California · Built 1962 · 1 Lanes · 3,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
49 0181G
Year Built
1962
Length
24.7 m (81 ft)
Max Span
6.7 m
Width
8 m (26.2 ft)
Lanes
1
Daily Traffic
3,200
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.