US HIGHWAY 395 SB over FIVE MILE CANYON
09-INY-395-R5.39L · County 027, California · Built 1948 · 2 Lanes · 6,400 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
35.871614, -117.883097
This bridge is in worse condition than 17.4% of bridges in County 027. The average bridge in California is 0 years old; this one is 78 years old.
Bridge Details
- Structure #
- 48 0051L
- Year Built
- 1948
- Reconstructed
- 1994
- Length
- 20.1 m (65.9 ft)
- Max Span
- 18.9 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 6,400
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.