US HIGHWAY 395 NB over FIVE MILE CANYON
09-INY-395-R5.12R · County 027, California · Built 1970 · 2 Lanes · 6,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.873297, -117.88815
This bridge is in worse condition than 17.4% of bridges in County 027. The average bridge in California is 0 years old; this one is 56 years old.
Bridge Details
- Structure #
- 48 0046R
- Year Built
- 1970
- Length
- 51.8 m (169.9 ft)
- Max Span
- 25.6 m
- Width
- 12.7 m (41.7 ft)
- Lanes
- 2
- Daily Traffic
- 6,400
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.