PANOCHE ROAD over LOS AGUILAS CREEK
14 MI W LITTLE PANOCHE RD · County 069, California · Built 1947 · 2 Lanes · 800 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
36.663503, -121.100278
This bridge is in worse condition than 90.8% of bridges in County 069. The average bridge in California is 0 years old; this one is 79 years old.
Nearby Bridges
PANOCHE ROAD over TRES PINOS CREEK
Built 1960
PANOCHE ROAD over TRES PINOS CREEK
Built 1995
PANOCHE ROAD over TRES PINOS CREEK
Built 1987
PANOCHE ROAD over TRES PINOS CREEK
Built 1935
PANOCHE ROAD over TRES PINOS CREEK
Built 1998
PANOCHE ROAD over TRES PINOS CREEK
Built 1963
SANTA ANITA ROAD over QUIEN SABE CREEK
Built 1984
STATE ROUTE 25 over SAN BENITO RIVER
Built 1955
STATE ROUTE 25 over WILLOW CREEK
Built 1966
PANOCHE ROAD over TRES PINOS CREEK
Built 1963
Bridge Details
- Structure #
- 43C0026
- Year Built
- 1947
- Length
- 14.6 m (47.9 ft)
- Max Span
- 9.1 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 800
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $225,000
- Total Project Cost
- $378,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.