PANOCHE ROAD over TRES PINOS CREEK

8 MI EAST OF SH 25 · County 069, California · Built 1987 · 2 Lanes · 800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
43C0011
Year Built
1987
Length
30.2 m (99.1 ft)
Max Span
11.6 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
800
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.