G STREET over VENTURA STREET

450FT N OF SANTA CLARA ST · County 019, California · Built 2023 · 3 Lanes · 10,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
42C0713
Year Built
2023
Length
29 m (95.1 ft)
Max Span
13.8 m
Width
21.3 m (69.9 ft)
Lanes
3
Daily Traffic
10,000
Material
Prestressed Concrete Continuous
Design
Slab
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.