STATE ROUTE 41 NB over CALIF GOLDEN ST G BROAD

06-FRE-041-R22.11-FRE · County 019, California · Built 1966 · 3 Lanes · 38,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
42 0226R
Year Built
1966
Length
645.6 m (2118.1 ft)
Max Span
49.4 m
Width
15.5 m (50.9 ft)
Lanes
3
Daily Traffic
38,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.