NORTH ABBY STREET over DRY CREEK CANAL

NORTH OF E. OLIVE AVE · County 019, California · Built 1955 · 3 Lanes · 4,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
42C0700
Year Built
1955
Length
14.2 m (46.6 ft)
Max Span
13.4 m
Width
20.8 m (68.2 ft)
Lanes
3
Daily Traffic
4,000
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$295,000
Total Project Cost
$495,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.