E180-ABBY ST OFFRP over ABBY STREET

06-FRE-180-R57.92-FRE · County 019, California · Built 1995 · 1 Lanes · 195 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
42 0320S
Year Built
1995
Length
39 m (128 ft)
Max Span
39 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
195
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.