E CENTRAL AVE over C & K CANAL

0.01 MI W OF NEWMARK AVE · County 019, California · Built 1925 · 2 Lanes · 1,434 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
42C0564
Year Built
1925
Reconstructed
1978
Length
19.5 m (64 ft)
Max Span
6.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
1,434
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$196,000
Total Project Cost
$329,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.