E LINCOLN AVE over C & K CANAL

0.3 MI E OF ACADEMY AVE · County 019, California · Built 1925 · 2 Lanes · 300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
42C0437
Year Built
1925
Reconstructed
1948
Length
10.7 m (35.1 ft)
Max Span
5.2 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
300
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.