S CLOVIS AVE over LIBERTY DITCH
1.0 MI SOUTH OF DAVIS AVE · County 019, California · Built 1942 · 2 Lanes · 300 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
36.459403, -119.708139
This bridge is in worse condition than 96.4% of bridges in County 019. The average bridge in California is 0 years old; this one is 84 years old.
Nearby Bridges
S FOWLER AVE over LIBERTY DITCH
Built 1925
S CLOVIS AVE over MURPHY SLOUGH
Built 1988
S FATIMA AVE over MURPHY SLOUGH
Built 1948
E HARLAN AVE over LIBERTY DITCH
Built 1960
S FOWLER AVE over MURPHY SLOUGH
Built 1922
SOUTH FOWLER AVE over FUTURE HIGH SPEED RAIL
Built 2023
E MOUNT WHITNEY AV over BIG B DITCH
Built 1928
EAST ELKHORN AVE over FUTURE HIGH SPEED RAIL
Built 2022
S CLOVIS AVE over GRANT CANAL
Built 1948
S FOWLER AVE over GRANT CANAL
Built 1980
Bridge Details
- Structure #
- 42C0528
- Year Built
- 1942
- Length
- 11 m (36.1 ft)
- Max Span
- 5.2 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $177,000
- Total Project Cost
- $297,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.