E MOUNT WHITNEY AV over BIG B DITCH
0.3 MI EAST OF PEACH AVE · County 019, California · Built 1928 · 2 Lanes · 2,270 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
36.431061, -119.72135
This bridge is in worse condition than 68.2% of bridges in County 019. The average bridge in California is 0 years old; this one is 98 years old.
Nearby Bridges
S TIBURCIO AVE over GRANT CANAL
Built 1937
S CLOVIS AVE over GRANT CANAL
Built 1948
S CLOVIS AVE over MURPHY SLOUGH
Built 1988
OLD KINGSTON GRADE over GRANT CANAL
Built 1949
S FATIMA AVE over MURPHY SLOUGH
Built 1948
S MAPLE AVE over GRANT CANAL
Built 1946
S FOWLER AVE over MURPHY SLOUGH
Built 1922
S FOWLER AVE over GRANT CANAL
Built 1980
12 3/4 AVE over KINGS RIVER
Built 1954
S CLOVIS AVE over LIBERTY DITCH
Built 1942
Bridge Details
- Structure #
- 42C0161
- Year Built
- 1928
- Reconstructed
- 1947
- Length
- 8.2 m (26.9 ft)
- Max Span
- 3.7 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,270
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.