N DEL REY AVE over FRESNO CANAL
0.5 MI SOUTH OF MCKINLEY · County 019, California · Built 1939 · 2 Lanes · 700 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
36.756683, -119.591914
This bridge is in worse condition than 96.4% of bridges in County 019. The average bridge in California is 0 years old; this one is 87 years old.
Nearby Bridges
N DEL REY AVE over GOULD CANAL
Built 1950
N MCCALL AVE over FRESNO CANAL
Built 1953
N MCCALL AVE over GOULD CANAL
Built 1925
N BETHEL AVE over GOULD CANAL
Built 1950
N MCCALL AVE over REDBANK SLOUGH
Built 1925
N ACADEMY AVE over FRESNO CANAL
Built 1942
MCKINLEY AVE over FANCHER CREEK
Built 2010
N FANCHER AVE over FANCHER CREEK CANAL
Built 1948
N FANCHER AVE over MILL DITCH
Built 1939
N ACADEMY AVE over GOULD CANAL
Built 2003
Bridge Details
- Structure #
- 42C0496
- Year Built
- 1939
- Reconstructed
- 1967
- Length
- 21.6 m (70.9 ft)
- Max Span
- 7.3 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 700
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $363,000
- Total Project Cost
- $610,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.