RD 5-1/5 SHULTZ RD over CHOWCHILLA RIVER

0.2 MI N OF AVE 24 · County 039, California · Built 2023 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
41C0221
Year Built
2023
Length
21.3 m (69.9 ft)
Max Span
10.4 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
200
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.