COUNTY ROAD 8 over CHOWCHILLA RIVER

0.4 MI N/O AVENUE 25 · County 039, California · Built 1995 · 2 Lanes · 275 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
41C0196
Year Built
1995
Length
21.5 m (70.5 ft)
Max Span
10.4 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
275
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.