STATE ROUTE 33 over NEWMAN WASTEWAY
10-MER-033-29.60 · County 047, California · Built 1952 · 2 Lanes · 7,100 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
37.292836, -121.012228
This bridge is in worse condition than 9.4% of bridges in County 047. The average bridge in California is 0 years old; this one is 74 years old.
Nearby Bridges
CANAL SCHOOL ROAD over NEWMAN WASTEWAY
Built 2013
UPPER ROAD over NEWMAN WASTEWAY
Built 1953
BRAZO ROAD over NEWMAN WASTEWAY
Built 1968
WHITWORTH ROAD over CCID MAIN CANAL
Built 1972
DRAPER ROAD over NEWMAN WASTEWAY
Built 1950
MOOREHEAD ROAD over CCID MAIN CANAL
Built 1926
FENTEM ROAD over CCID MAIN CANAL
Built 1925
DRAPER ROAD over CCID MAIN CANAL
Built 1939
ORESTIMBA ROAD over CCID MAIN CANAL
Built 1919
SHIELLS ROAD over CCID MAIN CANAL
Built 2019
Bridge Details
- Structure #
- 39 0124
- Year Built
- 1952
- Length
- 7.3 m (24 ft)
- Max Span
- 3.5 m
- Width
- 16.7 m (54.8 ft)
- Lanes
- 2
- Daily Traffic
- 7,100
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.