UPPER ROAD over NEWMAN WASTEWAY
0.2 MI S/O HALLOWELL RD · County 099, California · Built 1953 · 2 Lanes · 1,097 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
37.293878, -121.031417
This bridge is in worse condition than 86.5% of bridges in County 099. The average bridge in California is 0 years old; this one is 73 years old.
Nearby Bridges
DRAPER ROAD over NEWMAN WASTEWAY
Built 1950
STATE ROUTE 33 over NEWMAN WASTEWAY
Built 1952
MOOREHEAD ROAD over CCID MAIN CANAL
Built 1926
CANAL SCHOOL ROAD over NEWMAN WASTEWAY
Built 2013
WHITWORTH ROAD over CCID MAIN CANAL
Built 1972
SHIELLS ROAD over CCID MAIN CANAL
Built 2019
DRAPER ROAD over CCID MAIN CANAL
Built 1939
ORESTIMBA ROAD over CCID MAIN CANAL
Built 1919
EASTIN ROAD over NEWMAN WASTEWAY
Built 1930
BRAZO ROAD over NEWMAN WASTEWAY
Built 1968
Bridge Details
- Structure #
- 38C0167
- Year Built
- 1953
- Length
- 42.4 m (139.1 ft)
- Max Span
- 14 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,097
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $367,000
- Total Project Cost
- $616,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.