GILBERT ROAD over T.I.D. CERES MAIN CANAL
AT HATCH ROAD · County 099, California · Built 2021 · 2 Lanes · 420 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
37.609053, -120.915497
This bridge is in worse condition than 7% of bridges in County 099. The average bridge in California is 0 years old; this one is 5 years old.
Nearby Bridges
FAITH HOME ROAD over T.I.D. CERES MAIN CANAL
Built 1991
HATCH ROAD over CERES MAIN SPWY
Built 1916
EASTGATE BLVD over T.I.D. CERES MAIN CANAL
Built 2005
BOOTHE ROAD over T.I.D. CERES MAIN CANAL
Built 1989
CLINTON ROAD over T.I.D. CERES MAIN CANAL
Built 1967
FOWLER ROAD over T.I.D. CERES MAIN CANAL
Built 1985
SANTA FE AVENUE over TUOLUMNE RIVER
Built 2019
MITCHELL ROAD over TUOLUMNE RIVER
Built 1958
BALDWIN ROAD over T.I.D. CERES MAIN CANAL
Built 2002
WHITMORE AVENUE over T.I.D. CERES MAIN CANAL
Built 1982
Bridge Details
- Structure #
- 38C0348
- Year Built
- 2021
- Length
- 15.2 m (49.9 ft)
- Max Span
- 7.5 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 420
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.