CLINTON ROAD over T.I.D. CERES MAIN CANAL
50 SOUTH HATCH RD · County 099, California · Built 1967 · 2 Lanes · 167 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
37.609056, -120.897281
This bridge is in worse condition than 53.9% of bridges in County 099. The average bridge in California is 0 years old; this one is 59 years old.
Nearby Bridges
BALDWIN ROAD over T.I.D. CERES MAIN CANAL
Built 2002
SANTA FE AVE over T.I.D. CERES MAIN CANAL
Built 2009
SANTA FE AVENUE over TUOLUMNE RIVER
Built 2019
GILBERT ROAD over T.I.D. CERES MAIN CANAL
Built 2021
PADRE LANE over T.I.D. CERES MAIN CANAL
Built 2024
FAITH HOME ROAD over T.I.D. CERES MAIN CANAL
Built 1991
HATCH ROAD over CERES MAIN SPWY
Built 1916
TULLY ROAD over T.I.D. CERES MAIN CANAL
Built 1924
EASTGATE BLVD over T.I.D. CERES MAIN CANAL
Built 2005
BOOTHE ROAD over T.I.D. CERES MAIN CANAL
Built 1989
Bridge Details
- Structure #
- 38C0223
- Year Built
- 1967
- Length
- 13.7 m (44.9 ft)
- Max Span
- 6.7 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 167
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.