BLOSSOM ROAD over M.I.D. MAIN CANAL
0.5 MI N/O SR132 · County 099, California · Built 1926 · 2 Lanes · 500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
37.645975, -120.797014
This bridge is in worse condition than 86.5% of bridges in County 099. The average bridge in California is 0 years old; this one is 100 years old.
Nearby Bridges
STATE ROUTE 132 over WATERFORD CANAL
Built 1916
REINWAY AVENUE over M.I.D. MAIN CANAL
Built 1994
OAKDALE-WATRFD HWY over DRY CREEK
Built 1918
OAKDALE-WATRFD HWY over M.I.D. MAIN CANAL
Built 1920
HOPPER ROAD over M.I.D. MAIN CANAL
Built 1929
TIM BELL ROAD over M.I.D. MAIN CANAL
Built 1919
HICKMAN ROAD over TUOLUMNE RIVER
Built 2021
SWANSON ROAD over T.I.D. CERES MAIN CANAL
Built 1945
ALBERS ROAD over DRY CREEK
Built 1959
ALBERS ROAD over M.I.D. MAIN CANAL
Built 1925
Bridge Details
- Structure #
- 38C0292
- Year Built
- 1926
- Length
- 20.4 m (66.9 ft)
- Max Span
- 5 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $315,000
- Total Project Cost
- $529,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.