TIM BELL ROAD over M.I.D. MAIN CANAL

JUST SOUTH VINEYARD RD · County 099, California · Built 1919 · 2 Lanes · 1,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
38C0284
Year Built
1919
Reconstructed
1962
Length
19.8 m (65 ft)
Max Span
6.6 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,100
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.