FINNEY ROAD over M.I.D. LATERAL #6
0.3 MI N MURPHY/BACON RD · County 099, California · Built 1922 · 2 Lanes · 1,165 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
37.700611, -121.086569
This bridge is in worse condition than 34.7% of bridges in County 099. The average bridge in California is 0 years old; this one is 104 years old.
Nearby Bridges
SALIDA BOULEVARD over M.I.D. LATERAL #6
Built 1912
SALIDA BOULEVARD over M.I.D. LATERAL #6
Built 1938
ROUTE 219 over ROUTE 99
Built 2016
SB ROUTE 99 ONRAMP over SB ROUTE 99 OFFRAMP
Built 2016
PELANDALE AVE over ROUTE 99 ONRAMP OFFRAMPS
Built 2015
COVERT ROAD over M.I.D. LATERAL #6
Built 1925
HAMMETT ROAD over M.I.D. LATERAL #6
Built 1925
BECKWITH ROAD over M.I.D. LATERAL #7
Built 1925
DAKOTA AVENUE over M.I.D. LATERAL #7
Built 1925
WILLIAMS ROAD over M.I.D. LATERAL #6
Built 1925
Bridge Details
- Structure #
- 38C0108
- Year Built
- 1922
- Reconstructed
- 1990
- Length
- 7.3 m (24 ft)
- Max Span
- 3.4 m
- Width
- 15.8 m (51.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,165
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.