ROUTE 219 over ROUTE 99
10-STA-219-0.30 · County 099, California · Built 2016 · 8 Lanes · 14,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.708833, -121.08125
This bridge is in worse condition than 34.7% of bridges in County 099. The average bridge in California is 0 years old; this one is 10 years old.
Nearby Bridges
SALIDA BOULEVARD over M.I.D. LATERAL #6
Built 1912
SALIDA BOULEVARD over M.I.D. LATERAL #6
Built 1938
FINNEY ROAD over M.I.D. LATERAL #6
Built 1922
SB ROUTE 99 ONRAMP over SB ROUTE 99 OFFRAMP
Built 2016
PELANDALE AVE over ROUTE 99 ONRAMP OFFRAMPS
Built 2015
COVERT ROAD over M.I.D. LATERAL #6
Built 1925
HAMMETT ROAD over M.I.D. LATERAL #6
Built 1925
HAMMETT RD over UP RR
Built 1970
HAMMETT RD over STATE ROUTE 99
Built 1970
WILLIAMS ROAD over M.I.D. LATERAL #6
Built 1925
Bridge Details
- Structure #
- 38 0163
- Year Built
- 2016
- Length
- 62.2 m (204.1 ft)
- Max Span
- 30.6 m
- Width
- 42.1 m (138.1 ft)
- Lanes
- 8
- Daily Traffic
- 14,500
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.