SPERRY ROAD over SALADO CREEK

1.7 MI E/O I-5 W/O AE AV · County 099, California · Built 1920 · 5 Lanes · 8,770 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
38C0104
Year Built
1920
Reconstructed
2001
Length
7 m (23 ft)
Max Span
6.5 m
Width
28 m (91.9 ft)
Lanes
5
Daily Traffic
8,770
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.