INTERSTATE 5 SB over NIELS HANSON RD
10-STA-005-14.94 · County 099, California · Built 1967 · 2 Lanes · 18,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
37.452267, -121.172025
This bridge is in worse condition than 86.5% of bridges in County 099. The average bridge in California is 0 years old; this one is 59 years old.
Nearby Bridges
INTERSTATE 5 NB over NIELS HANSON RD
Built 1967
SPERRY AVE over DELTA-MENDOTA CANAL
Built 2007
SPERRY AVENUE over CALIFORNIA AQUEDUCT
Built 1967
INTERSTATE 5 NB over DIABLO GRANDE PKWY
Built 1967
INTERSTATE 5 SB over DIABLO GRANDE PKWY
Built 1967
CALVINSON PARKWAY over SALADO CREEK
Built 2006
ROGERS ROAD over DELTA-MENDOTA CANAL
Built 1949
SPERRY ROAD over SALADO CREEK
Built 1920
SHEARWATER DRIVE over SALADO CREEK
Built 2006
WARD AVENUE over DELTA-MENDOTA CANAL
Built 1944
Bridge Details
- Structure #
- 38 0118L
- Year Built
- 1967
- Length
- 48.8 m (160.1 ft)
- Max Span
- 19.5 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 18,000
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $627,000
- Total Project Cost
- $1,053,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.