COMER WAY over CALABAZAS CREEK

WEST OF PIERCE RD · County 085, California · Built 1971 · 2 Lanes · 460 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
37C0292
Year Built
1971
Length
10.4 m (34.1 ft)
Max Span
9.8 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
460
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.