RAMP/CONNECTOR 85 over CALABAZAS CREEK

04-SCL-085-R15.40-SJS · County 085, California · Built 1993 · 1 Lanes · 8,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
37 0527S
Year Built
1993
Length
45.4 m (149 ft)
Max Span
22.6 m
Width
7.8 m (25.6 ft)
Lanes
1
Daily Traffic
8,600
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.