MISSION COL BLVD over SAN TOMAS AQUINO CREEK
NEAR AGNEW RD · County 085, California · Built 1976 · 4 Lanes · 2,853 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
37.388947, -121.968547
This bridge is in worse condition than 69.4% of bridges in County 085. The average bridge in California is 0 years old; this one is 50 years old.
Nearby Bridges
AGNEW RD over SAN TOMAS AQUINO CREEK
Built 1966
U.S. HIGHWAY 101 over SAN TOMAS AQUINO CREEK
Built 1961
BOWERS AVENUE over U.S. HIGHWAY 101
Built 1975
SAN TOMAS EXPWY over U.S. HIGHWAY 101
Built 1961
SCOTT BLVD over SAN TOMAS AQUINO CREEK
Built 1973
MONTAGUE EXPWY over UP RR LAFAYETTE BASSETT
Built 1962
CENTRAL EXPRWY WB over SAN TOMAS AQUINO CREEK
Built 1963
US 101 FRONTAGE RD over CALABAZAS CREEK
Built 1960
CENTRAL EXPRESSWAY over SAN TOMAS EXPRESSWAY
Built 1977
CENTRAL EXPWY EB over SAN TOMAS AQUINO CREEK
Built 1963
Bridge Details
- Structure #
- 37C0251
- Year Built
- 1976
- Length
- 34.4 m (112.9 ft)
- Max Span
- 11.3 m
- Width
- 28 m (91.9 ft)
- Lanes
- 4
- Daily Traffic
- 2,853
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.