CENTRAL EXPWY EB over SAN TOMAS AQUINO CREEK

0.25 MI N SA TOMAS EXPWY · County 085, California · Built 1963 · 2 Lanes · 36,160 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
37C0184R
Year Built
1963
Length
28 m (91.9 ft)
Max Span
11 m
Width
21.3 m (69.9 ft)
Lanes
2
Daily Traffic
36,160
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.