BLOSSOM HILL RD over CANOAS CREEK

2.0 MI E ALMADEN EXP · County 085, California · Built 1962 · 6 Lanes · 20,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
37C0106
Year Built
1962
Reconstructed
1981
Length
16.2 m (53.1 ft)
Max Span
5.2 m
Width
37.2 m (122 ft)
Lanes
6
Daily Traffic
20,400
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.