SB STATE ROUTE 85 over BLOSSOM HILL STATION PUC

04-SCL-085-4.17-SJS · County 085, California · Built 1991 · 5 Lanes · 51,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
37 0436L
Year Built
1991
Length
22.6 m (74.1 ft)
Max Span
22.6 m
Width
30.8 m (101 ft)
Lanes
5
Daily Traffic
51,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.