BLOSSOM HILL RD over BLOSSOM HILL RD PED PATH

04-SCL-101-R28.74 · County 085, California · Built 2021 · 1 Lanes · 2,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
37 0675K
Year Built
2021
Length
11.4 m (37.4 ft)
Max Span
10.5 m
Width
8.7 m (28.5 ft)
Lanes
1
Daily Traffic
2,600
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.