BLOSSOM HILL RD over BLOSSOM HILL RD PED PATH

04-SCL-101-28.68 · County 085, California · Built 2021 · 4 Lanes · 21,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
37 0675J
Year Built
2021
Length
10.7 m (35.1 ft)
Max Span
10.7 m
Width
19.4 m (63.6 ft)
Lanes
4
Daily Traffic
21,000
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.