INTERSTATE 880 over FOREST AVE

04-SCL-880-0.69-SJS · County 085, California · Built 1959 · 8 Lanes · 163,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
37 0173
Year Built
1959
Reconstructed
1994
Length
39.6 m (129.9 ft)
Max Span
18 m
Width
40.8 m (133.9 ft)
Lanes
8
Daily Traffic
163,000
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.