NB 280 TO NB 880 over NB I-280 & I-880 OFFRAMP

04-SCL-280-5.34 · County 085, California · Built 2015 · 1 Lanes · 6,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
37 0673G
Year Built
2015
Length
155.1 m (508.9 ft)
Max Span
54.3 m
Width
11.2 m (36.7 ft)
Lanes
1
Daily Traffic
6,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.