LINDEN AVE over COLMA CANAL
0.2 MI W US 101 · County 081, California · Built 1974 · 4 Lanes · 7,160 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
37.650167, -122.411867
This bridge is in worse condition than 90.3% of bridges in County 081. The average bridge in California is 0 years old; this one is 52 years old.
Nearby Bridges
SAN MATEO AVE over COLMA CREEK
Built 1960
U.S. HIGHWAY 101 over AIRPORT BOULEVARD
Built 1947
U.S. HIGHWAY 101 over UP RR SPUR
Built 1948
U.S. HIGHWAY 101 over COLMA CREEK
Built 1947
SOUTH CANAL STREET over BRANCH OF COLMA CREEK
Built 1955
SPRUCE AVE over COLMA CREEK
Built 1975
US HIGHWAY 101 SB over CALTRAIN UP RR GRAND ONR
Built 1948
PRODUCE AVE over COLMA CREEK
Built 1977
SOUTH AIRPORT BLVD over COLOMA CREEK
Built 1977
US HIGHWAY 101 NB over CALTRAIN UP RR GRAND ONR
Built 1948
Bridge Details
- Structure #
- 35C0031
- Year Built
- 1974
- Length
- 23.2 m (76.1 ft)
- Max Span
- 22.6 m
- Width
- 18.3 m (60 ft)
- Lanes
- 4
- Daily Traffic
- 7,160
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $424,000
- Total Project Cost
- $712,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.