US HIGHWAY 101 SB over CALTRAIN UP RR GRAND ONR

04-SM-101-21.92-SSF · County 081, California · Built 1948 · 4 Lanes · 98,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
35 0094L
Year Built
1948
Reconstructed
1969
Length
251.8 m (826.1 ft)
Max Span
36.2 m
Width
17.7 m (58.1 ft)
Lanes
4
Daily Traffic
98,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,457,000
Total Project Cost
$7,487,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.