MARINERS ISLAND BL over STATE ROUTE 92

04-SM-092-R12.78-SM · County 081, California · Built 1977 · 4 Lanes · 2,330 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
35 0284
Year Built
1977
Length
276.1 m (905.8 ft)
Max Span
38.1 m
Width
25.9 m (85 ft)
Lanes
4
Daily Traffic
2,330
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.