U.S. HIGHWAY 101 over BOREL CREEK

04-SM-101-11.67-SM · County 081, California · Built 1954 · 11 Lanes · 195,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
35 0140
Year Built
1954
Reconstructed
1985
Length
10.1 m (33.1 ft)
Max Span
9.4 m
Width
79.9 m (262.1 ft)
Lanes
11
Daily Traffic
195,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.