THIRD ST over CHINA BASIN

S OF BERRY ST · County 075, California · Built 1932 · 4 Lanes · 25,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
34C0025
Year Built
1932
Reconstructed
1998
Length
89.9 m (294.9 ft)
Max Span
43.4 m
Width
22 m (72.2 ft)
Lanes
4
Daily Traffic
25,000
Material
Steel
Design
Movable - Bascule
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.