RTE 280 NB ON-RAMP over CHINA BASIN BERRY 6 ST

04-SF-280-T7.18-SF · County 075, California · Built 1998 · 2 Lanes · 18,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
34 0123L
Year Built
1998
Length
442.7 m (1452.4 ft)
Max Span
50.9 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
18,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.