JUSTIN DRIVE over ROUTE I 280

04-SF-280-R3.23-SF · County 075, California · Built 1963 · 3 Lanes · 5,512 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
34 0075
Year Built
1963
Length
55.6 m (182.4 ft)
Max Span
27.6 m
Width
14.6 m (47.9 ft)
Lanes
3
Daily Traffic
5,512
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$816,000
Total Project Cost
$1,370,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.