MISSION STREET over ROUTE I 280

04-SF-280-R3.11-SF · County 075, California · Built 1963 · 4 Lanes · 23,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
34 0012
Year Built
1963
Length
71.6 m (234.9 ft)
Max Span
38.1 m
Width
25 m (82 ft)
Lanes
4
Daily Traffic
23,600
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.