FREMONT BOULEVARD over INTERSTATE 880
04-ALA-880-11.50-FMT · County 001, California · Built 1998 · 8 Lanes · 27,524 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
37.578786, -122.048389
This bridge is in worse condition than 57.1% of bridges in County 001. The average bridge in California is 0 years old; this one is 28 years old.
Nearby Bridges
ALVARADO BLVD over ALAMEDA FLOOD CNTRL CHNL
Built 1966
INTERSTATE 880 over PATTERSON SLOUGH
Built 1957
PASEO PADRE PKWY over INTERSTATE 880
Built 1981
INTERSTATE 880 over CRANDALL CREEK
Built 1958
PASEO PADRE PKWY over UP RR & AMTRAK
Built 1980
ALVARADO-NILES RD over DRY CREEK
Built 1957
ALVARADO-NILES RD over DRY CREEK
Built 1978
STATE ROUTE 84 over INTERSTATE 880
Built 1984
S880-W84 CONNECTOR over PEDESTRIAN WALKWAY
Built 1990
DECOTO ROAD over ALAMEDA CREEK TRIBUTARY
Built 1920
Bridge Details
- Structure #
- 33 0618
- Year Built
- 1998
- Length
- 105.5 m (346.1 ft)
- Max Span
- 52.1 m
- Width
- 39 m (128 ft)
- Lanes
- 8
- Daily Traffic
- 27,524
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.