INTERSTATE 880 over PATTERSON SLOUGH
04-ALA-880-11.80-FMT · County 001, California · Built 1957 · 8 Lanes · 198,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.583611, -122.050186
This bridge is in worse condition than 93.7% of bridges in County 001. The average bridge in California is 0 years old; this one is 69 years old.
Nearby Bridges
ALVARADO BLVD over ALAMEDA FLOOD CNTRL CHNL
Built 1966
FREMONT BOULEVARD over INTERSTATE 880
Built 1998
PASEO PADRE PKWY over INTERSTATE 880
Built 1981
INTERSTATE 880 over ALAMEDA CREEK
Built 1957
ALVARADO-NILES RD over DRY CREEK
Built 1957
ALVARADO-NILES RD over DRY CREEK
Built 1978
INTERSTATE 880 over CRANDALL CREEK
Built 1958
ALVARADO-NILES RD over INTERSTATE 880
Built 1998
SANTA MARIA DR over ALAMEDA CREEK
Built 1965
PASEO PADRE PKWY over UP RR & AMTRAK
Built 1980
Bridge Details
- Structure #
- 33 0250
- Year Built
- 1957
- Reconstructed
- 1989
- Length
- 139.6 m (458 ft)
- Max Span
- 14.6 m
- Width
- 45.1 m (148 ft)
- Lanes
- 8
- Daily Traffic
- 198,000
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,297,000
- Total Project Cost
- $10,578,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.