HOPYARD DOUGHERTY over INTERSTATE 580

04-ALA-580-19.86-PLE · County 001, California · Built 1988 · 6 Lanes · 6,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
33 0551
Year Built
1988
Reconstructed
1994
Length
135.3 m (443.9 ft)
Max Span
74.4 m
Width
37 m (121.4 ft)
Lanes
6
Daily Traffic
6,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.