INTERSTATE 580 over CHABOT CANAL

04-ALA-580-19.72-PLE · County 001, California · Built 1994 · 14 Lanes · 254,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
33 0474
Year Built
1994
Length
8.1 m (26.6 ft)
Max Span
2.4 m
Lanes
14
Daily Traffic
254,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.