NAVY DRIVE over SAN JOAQUIN RIVER
ROUGH AND READY ISLAND · County 077, California · Built 2018 · 2 Lanes · 8,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
37.946556, -121.338517
This bridge is in worse condition than 52.5% of bridges in County 077. The average bridge in California is 0 years old; this one is 8 years old.
Nearby Bridges
INTERSTATE 5 over MONTE DIABLO AVE
Built 1970
INTERSTATE 5 over MONTE DIABLO AVE
Built 1970
INTERSTATE 5 over UP RR SPUR W ACACIA ST
Built 1970
INTERSTATE 5 over CARLTON AVE
Built 1970
INTERSTATE 5 over CARLTON AVE
Built 1970
RAMP/CONNECTOR 5 over CARLTON AVE
Built 1970
INTERSTATE 5 NB over SHIMIZU DR & SMITH CANAL
Built 1968
INTERSTATE 5 SB over SHIMIZU DR & SMITH CANAL
Built 1968
STATE ROUTE 4 over STATE ROUTE 4
Built 2017
PORT STOCKTON EXPR over SAN JOAQUIN RIVER (BURNS
Built 2007
Bridge Details
- Structure #
- 29C0464
- Year Built
- 2018
- Length
- 86.9 m (285.1 ft)
- Max Span
- 31.6 m
- Width
- 20.4 m (66.9 ft)
- Lanes
- 2
- Daily Traffic
- 8,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.