INTERSTATE 5 over MONTE DIABLO AVE

10-SJ-005-27.91-STKN · County 077, California · Built 1970 · 4 Lanes · 56,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
29 0188R
Year Built
1970
Reconstructed
2005
Length
51.2 m (168 ft)
Max Span
50.6 m
Width
25.5 m (83.7 ft)
Lanes
4
Daily Traffic
56,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.